1) Basic consent - for the connection to the transmission grid.

SOLAR PLANT – WITH THE CAPACITY OF 52 MW (AC) FEDERATION OF BOSNIA AND HERZEGOVINA
The project is planned for an output power of 52 MW, and the total installed power will be 62 MW. The project is divided into smaller power plants. The estimated annual production 84,7 GWh.
The price is 142.000 EUR per MW (AC), in the ready to build phase.
The seller stated that he would intend to sell all project(s).
Status of permits:
Property-legal relations have been resolved in the entire area – concession has been obtained on the state land, and provided in the land excerpts.The access road property-legal relations have been resolved:
2)Environmental permit.
3)Location permit.
4)Concession right.
5)Conditions for connection (the transmission grid is approx. 3 km away).
6)Energy permit.
7)The future steps is Construction permit.
The seller requests to conclude an NDA (Confidentiality Agreement) with the potential buyer. The aforementioned NDA agreement does not represent any form of legally binding relationship regarding the purchase of the Project.
Get in touch
Share your thoughts with us
Address
Trg mladih 7d ,Brcko
info@investinbalkan.com
Phone
049/206-182