projects-image
Green Energy

SOLAR PLANT – WITH THE CAPACITY OF 120,5 MW (AC) REPUBLIC OF SRPSKA

The project is planned for an output power of 120,5 MW, and the total installed power will be 136 MW. The estimated annual production is 202,5 GWh.

The price is 110-115.000 EUR per MW (AC), in the ready to build phase.

The seller stated that he would intend to sell all project.

Status of permits:

Property-legal relations have been resolved in the entire area - the concession has been obtained on the state land, and provided in the land excerpts. The access road property-legal relations have been resolved:

1) Basic consent - for the connection to the transmission grid.

2)Environmental permit.

3)Location conditions.

4)Concession right.

5)Conditions for connection.

6)The pre-PPA has been concluded.

7)The request for construction permit for the preparation works has been filed.

The seller requests to conclude an NDA (Confidentiality Agreement) with the potential buyer. The aforementioned NDA agreement does not represent any form of legally binding relationship regarding the purchase of the Project.

Get in touch

Share your thoughts with us

Address

Trg mladih 7d ,Brcko

Email

info@investinbalkan.com

Phone

049/206-182

logo

Copyright © 2025 All rights reserved Project Pro