1)Environmental permit.

Green Energy
SOLAR PLANT – WITH THE CAPACITY OF 8 MW (AC) REPUBLIC OF SRPSKA
The project is planned for an output power of 8 MW. The estimated annual production 11,7 GWh. The project is developed on the private land.
The expected price will be discussed.
The seller stated that he would intend to sell all project.
Status of permits:
Property-legal relations have been resolved in the entire area - the land is privately owned.The access road property-legal relations have been resolved:
2)Location permit.
3)Concession right.
4)Electro-energy consent.
5)Construction consent has been preparing.
Get in touch
Share your thoughts with us
Address
Trg mladih 7d ,Brcko
info@investinbalkan.com
Phone
049/206-182