projects-image
Green Energy

SOLAR PLANT – WITH THE CAPACITY OF 1,7 MW (AC) REPUBLIC OF SRPSKA

The project is planned for an output power of 1,7 MW. The estimated annual production 2,37 GWh. The project is developed on the private land.

The expected price is 200.000 EUR per MW (AC), in the ready to build phase.

Status of permits:

Property-legal relations have been resolved in the entire area - the land is privately owned.The access road property-legal relations have been resolved:

1)Environmental permit.

2)Location permit.

3)Electro-energy consent.

4)Construction permit.

Get in touch

Share your thoughts with us

Address

Trg mladih 7d ,Brcko

Email

info@investinbalkan.com

Phone

049/206-182

logo

Copyright © 2025 All rights reserved Project Pro