1)Environmental permit.

Green Energy
SOLAR PLANT – WITH THE CAPACITY OF 1,7 MW (AC) REPUBLIC OF SRPSKA
The project is planned for an output power of 1,7 MW. The estimated annual production 2,37 GWh. The project is developed on the private land.
The expected price is 200.000 EUR per MW (AC), in the ready to build phase.
Status of permits:
Property-legal relations have been resolved in the entire area - the land is privately owned.The access road property-legal relations have been resolved:
2)Location permit.
3)Electro-energy consent.
4)Construction permit.