1) Basic consent - for the connection to the transmission grid.

Green Energy
WIND FARM – WITH THE CAPACITY OF 80 MW (AC) FEDERATION OF BOSNIA AND HERZEGOVINA
The project is planned for an output power of 80 MW and estimated annual production is 290 GWh. The project is developed on the state land.
The expected price is 140-150.000 EUR per MW (AC), in the ready to build phase.
The seller stated that he would intend to sell all project.
Status of permits:
Property-legal relations have been resolving – final stage.The access road property-legal relations have been resolved:
2)Environmental permit.
3)Location permit.
4)Concession right.
5)Conditions for connection.
6)The request for energy permit is in the final stage of preparation.