1)Basic consent - for the connection to the transmission grid.

Green Energy
WIND FARM – WITH THE CAPACITY OF 150 MW (AC) FEDERATION OF BOSNIA AND HERZEGOVINA
The project is planned for an output power of 150 MW and estimated annual production is 606 GWh. The project is developed on the state land.
The expected price will be discussed.
The seller stated that he would intend to sell part of project (e.g. 40-60% or to have joint-venture).
Status of permits:
Property-legal relations have been resolving – final stage.The access road property-legal relations have been resolved:
2)Environmental permit.
3)Location conditions.
4)Concession right.
5)Conditions for connection.
6)Energy permit.